Cast Iron Under Slab
Vertical Condo Drains
6 Installation Steps
About Us

Trenchless sewer repair service re-lines backed-up cast iron drains lasting 100 years, without excavation!

If you found this page on our website you have probably been informed by plumbers that your cast iron drains underneath your slabs or in the walls of your high rise condo have to be excavated and replaced. The good news is that our modern tried-and-tested trenchless pipe lining technology has been installed in thousands of homes and only costs about half as much as the old fashioned excavation methods.

Broken cast iron drains before pipe lining in Miami

Broken cast iron drains before pipe lining in Miami

AVOID Excavation through slab to replace cast iron drains. Trenchless sewer drain replacement lasts 50+ years

This 50-year warranty pipe lining stops backups permanently

This technology essentially installs a new inner pipe lining inside the old compromised pipe. The condition of the old pipe is irrelevant as it is first completely cleaned to remove all scale and rust and then the new sleeving material is installed. The sleeve is completely inert it cannot react with acids, alkaline substances, or even volatile substances like nail polish remover. The other good thing is that the liner once it is turned rock hard inside the old pipe, is a stand-alone pipe by itself and does not need the old host pipe for any physical support. The liner is super strong and is designed to be used in load-bearing situations like under footers of houses.

 

3-Minute Video About Costs and Installation:

3-Our Trenchless Pipe Lining As Featured on “Designing Spaces” On TV

How does this pipes sleeving aka “cured in place pipe” lining work?

All of the work is performed from outside of the house or the building. The old pipe is accessed where it leaves the building and a small hole is dug to cut open the pipe, typically in a grassy area. From here specialized pipe cleaning using special high pressure water hydro jetting machines and other technology is used to remove all the old scale and accumulated rust.

Next the flexible fabric sleeve is saturated with 100% epoxy resin which comes in two parts that when mixed in the correct ratio will heat up to 180 degrees Fahrenheit that hardens the resin. Once the lining is completely saturated it is pulled into the old pipe and the sleeve has a temporary internal balloon which is inflated to 18 psi for about 4 hours after which the balloon is removed and the sleeve has become rock hard. The newly sleeved cast iron drain can be used immediately.

Benefits of pipes sleeving in Coral Gables vs excavation

As the name suggest, Coral Gables is built on coral rock. This material is very difficult to excavate and so pipe replacement by excavation takes a very long time is very expensive and very messy. Homeowners have to live in hotels for weeks on end and put their pets in some kind of pet care facility. Pipes sleeving on the other hand only takes a couple of days to do for an entire 3 bedroom 2 bathroom house, costs about half as much as excavation and has a 100 year expected life. Homeowners can also stay in their property and use the pipes every evening until the next morning.

Call us for a free estimate or fill out the form on the top right to schedule one

Google+
Contact Us

I would like to:

What Type of Property Need Pipe Lining Service :

Your Name:

Your Email:

Address:

City, State, Zip:

Phone:

Questions/Comments:

[recaptcha]

FEATURED PROJECTS
Triton Towers, Miami Beach
Historic Guarantee Building
West Palm
Patrick Air Force Base
Melbourne
The Prince Condominiums
Marco Island, FL
Harbor House
Naples, FL
SERVING THE FOLLOWING AREAS:
Tampa
St. Petersburg
Sarasota
Venice
Cape Coral
Naples
Miami
Fort Lauderdale
West Palm Beach
Port St Lucie
Delray Beach
Boca Raton
Pompano Beach
Hollywood
Coral Gables
Fort Myers
Port Charlotte
Orlando
Clearwater
Longboat Key