The Problem  – Future Corrosion Under Prominent High Rise Building – The NEW 4 WTC!

2000' Of Epoxy Lining Inside Storm Drain

2000′ Of Epoxy Lining Inside Storm Drain

When storm drains corrode the resulting sand infiltration causes settlement in the ground above it, resulting in concrete cracks and floor depressions. Ultimately the pipes collapse completely requiring excavation for pipe replacement.

The Solution – 2000′ of Epoxy Pipe Lining To Prevent Future Corrosion

Since our epoxy is completely inert, it was used to spray a computer controlled thickness of the material onto the inside of he pipes. The project took 1.5 days.

Google+
Contact Us

    Your Name:

    Your Email:

    Address:

    City, State, Zip:

    Phone:

    Questions/Comments:

    How long does cast iron last.
    Pipe replacement options
    Cost
    Why backup
    Picote add pic
    Harbor House
    Naples, FL
    SERVING THE FOLLOWING AREAS:
    Tampa
    St. Petersburg
    Sarasota
    Venice
    Cape Coral
    Naples
    Miami
    Fort Lauderdale
    West Palm Beach
    Port St Lucie
    Delray Beach
    Boca Raton
    Pompano Beach
    Hollywood
    Coral Gables
    Fort Myers
    Port Charlotte
    Orlando
    Clearwater
    Longboat Key