Saving The New Top Secret Construction At Patrick Air Force Base – Melbourne, FL

The Problem

patrick air forceA brand new state of the art electronic surveillance building that operates globally was recently completed when it was discovered that some screws had penetrated this 70′ high building’s vertical rain drains.

The location of the screws was such that the roof would have to be dismantled to remove them. Since the building was already occupied, this was not an option.

The Solution

In one day we re-lined the pipes with double liners, which covered the screws and sealed the leaks. The savings were over $700,000.

Google+
Contact Us

    Your Name:

    Your Email:

    Address:

    City, State, Zip:

    Phone:

    Questions/Comments:

    How long does cast iron last.
    Pipe replacement options
    Cost
    Why backup
    Picote add pic
    Harbor House
    Naples, FL
    SERVING THE FOLLOWING AREAS:
    Tampa
    St. Petersburg
    Sarasota
    Venice
    Cape Coral
    Naples
    Miami
    Fort Lauderdale
    West Palm Beach
    Port St Lucie
    Delray Beach
    Boca Raton
    Pompano Beach
    Hollywood
    Coral Gables
    Fort Myers
    Port Charlotte
    Orlando
    Clearwater
    Longboat Key